Wasted area transformed with a turning area and new road up to a newly installed steel framed building. Groundworks consisted of digging out and replacing with type 1 and compacted with a bomag. Formwork then installed in bays with road formers. Concrete was pumped in and laid with a power tamper and then a float finish. Steel framed building was erected by our team – a service which we do offer.